Inner slide

Vision

Our vision is to establish bulk water Infrastructure projects across the state for drinking water and ensure equitable and efficient distribution of water for Regional Water Supply Schemes (RWSS) for villages covered by GWSSB, Nagar Palikas, Corporations and Industries.

Mission

For the growth of Gujarat establishing bulk water pipe grid based on Narmada water in Gujarat state for satisfying water needs of Gujarat state through bulk supply.

Projects

Previous Next

PROJECT  : 300 MLD WSS for Brahmani dam-2 to NC7 PS ( PKG-1)

Section Name :  Brahmani Dam-II to NC-7 Morbi pumping Station
Package :  brahmani Project
Diameter & Thickness (In MM) :  2000
Length :  850.00                  Cost In Cr. :  29.17
Operated By :  GWIL
 

PROJECT  : 300 MLD WSS for Brahmani dam-2 to NC7 PS ( PKG-2)

Section Name :  Brahmani Dam-2 to Chakampar village
Package :  Brahmi Project pkg-2
Diameter & Thickness (In MM) :  2000
Length :  18400.00                  Cost In Cr. :  122.78
Operated By :  GWIL
 

PROJECT  : 300 MLD WSS for Brahmani dam-2 to NC7 PS ( PKG-3)

Section Name :  Chakampar village canal crossing road to Nava sadulka
Package :  brahmani Project pkg-3
Diameter & Thickness (In MM) :  2000
Length :  14600.00                  Cost In Cr. :  100.88
Operated By :  GWIL
 

PROJECT  : Budhel to Borda Bulk pipeline project

Section Name :  Budhel to Borda
Package :  NC41
Diameter & Thickness (In MM) :  1600 mm
Length :  58.00                  Cost In Cr. :  376.00
Operated By :  GWIL
 

PROJECT  : Navada-Gadhada-Chavand Bulk pipeline project

Section Name :  Navada-Gadhada-Chavand
Package :  NC39 NC40
Diameter & Thickness (In MM) :  1950/1850
Length :  85.00                  Cost In Cr. :  644.00
Operated By :  GWIL
 

NewsRoom