Inner slide

Completed Project : NC 33

image
Section Name :  Dudhrej to Navagam (Ch. 33.500 to 86.000 Km)
Package :  Swarnim Gujarat Project
Diameter & Thickness (In MM) :  2150 mm dia (FID) 14.50 mm thick M.S. pipeline
Transmission :  Pumping
Length :  52.80
Cost In Cr. :  293.44
Operated By :  GWIL
Executed By :  GWIL

Dudhrej to Navagam (Ch. 33.500 to 86.000 Km)

Salient Features

Name of Project Swarnim Gujarat Saurashtra-Kutch water grid pipe line programme
Section Dhudharej to Navagam (Than) Section
Package NC-33
Start Date 5/11/2011
Completion Date 31/10/2013
Pipeline Details Dia of Pipe 2150 mm
Lenghth of pipe in km 52.8
Transmission 37.50 KM raising main and 15.30 KM Gravity main
Pipe carrying capacity in MLD 467 MLD (From Dudharej)
Details of Sump No. of Sump 1 sump
Size of Sump 100 mtr x 33 mtr
Capacity of Sump 15 ML
Pump house details Size of pump house 1200 Sq.mtr.
Type HSCF
m3/Hrs 1950 m3/hrs
Head 116 mtr.
Number 12
Working 10
Standby 2

Projects

Previous Next

PROJECT  : NC-38

Section Name :  Upleta to Kutiyana- Ranavav
Package :  NC-38
Diameter & Thickness (In MM) :  800/600
Length :  63.98                  Cost In Cr. :  120.83
Operated By :  GWIL
 

PROJECT  : 300 MLD WSS for Brahmani dam-2 to NC7 PS ( PKG-1)

Section Name :  Brahmani Dam-II to NC-7 Morbi pumping Station
Package :  brahmani Project
Diameter & Thickness (In MM) :  2000
Length :  850.00                  Cost In Cr. :  29.17
Operated By :  GWIL
 

PROJECT  : 300 MLD WSS for Brahmani dam-2 to NC7 PS ( PKG-2)

Section Name :  Brahmani Dam-2 to Chakampar village
Package :  Brahmi Project pkg-2
Diameter & Thickness (In MM) :  2000
Length :  18400.00                  Cost In Cr. :  122.78
Operated By :  GWIL
 

PROJECT  : 300 MLD WSS for Brahmani dam-2 to NC7 PS ( PKG-3)

Section Name :  Chakampar village canal crossing road to Nava sadulka
Package :  brahmani Project pkg-3
Diameter & Thickness (In MM) :  2000
Length :  14600.00                  Cost In Cr. :  100.88
Operated By :  GWIL
 

NewsRoom