Ongoing Project : Navada-Gadhada-Chavand Bulk pipeline project

image
Section Name :  Navada-Gadhada-Chavand
Package :  NC39 NC40
Diameter & Thickness (In MM) :  1950/1850
Transmission :  Pumping
Length :  85.00
Cost In Cr. :  644.00
Operated By :  GWIL
Executed By :  GWIL

NC-39, NC-40

૮૫ કી.મી પાઇપલાઇન, ૧૦૦ લાખ લીટર-૨ નંગ તથા ૨૦૦ લાખ લીટરના ૧ નંગ સંપ તથા સીવીલ તથા ઇલેકટ્રો મીકેનીકલ અને અન્ય આનુસંગીક કામગીરી

લાભાર્થી જીલ્લાઓ:રાજકોટ, જુનાગઢ, અમરેલી, પોરબંદર

Projects

Previous Next

PROJECT  : 300 MLD WSS for Brahmani dam-2 to NC7 PS ( PKG-1)

Section Name :  Brahmani Dam-II to NC-7 Morbi pumping Station
Package :  brahmani Project
Diameter & Thickness (In MM) :  2000
Length :  850.00                  Cost In Cr. :  29.17
Operated By :  GWIL
 

PROJECT  : 300 MLD WSS for Brahmani dam-2 to NC7 PS ( PKG-2)

Section Name :  Brahmani Dam-2 to Chakampar village
Package :  Brahmi Project pkg-2
Diameter & Thickness (In MM) :  2000
Length :  18400.00                  Cost In Cr. :  122.78
Operated By :  GWIL
 

PROJECT  : 300 MLD WSS for Brahmani dam-2 to NC7 PS ( PKG-3)

Section Name :  Chakampar village canal crossing road to Nava sadulka
Package :  brahmani Project pkg-3
Diameter & Thickness (In MM) :  2000
Length :  14600.00                  Cost In Cr. :  100.88
Operated By :  GWIL
 

PROJECT  : Budhel to Borda Bulk pipeline project

Section Name :  Budhel to Borda
Package :  NC41
Diameter & Thickness (In MM) :  1600 mm
Length :  58.00                  Cost In Cr. :  376.00
Operated By :  GWIL
 

PROJECT  : Navada-Gadhada-Chavand Bulk pipeline project

Section Name :  Navada-Gadhada-Chavand
Package :  NC39 NC40
Diameter & Thickness (In MM) :  1950/1850
Length :  85.00                  Cost In Cr. :  644.00
Operated By :  GWIL
 