Section Name :  Kesaria to Sonaria
Package :  Package B
Diameter & Thickness (In MM) :  1500 / 1100 / 850 mm Dia
Transmission :  pumping & Gravity
Length :  64.25
Cost In Cr. :  389.72
Operated By :  GWIL
Executed By :  GWIL

Kesaria to Sonaria

Salient Features of NC-25 Project
Name of Project NC-25
Section Keshariya to Sonariya
Package NC-25
Start Date 15/10/2009
Completion Date 25/03/2012
Pipeline Details Dia of pipe in mm 1500mm = 41378 mtr. , 1100mm = 3759mtr. ,850mm= 19121mtr.
Length of pipe in km Transmission Main = 64258mtr.
Transmission 1500mm to 850mm dia MS pipe of length = 64258mtr.
pipe carrying capacity In MLD 133.63
Details of sump No. of sump 1 Nos at Keshariya Head Work site. & 1 Nos. at Sonariya Head Work Site
Size of sump At Keshariya 50 X 40 X 4.30 mtr. At Sonariya 25.25 dia & 4.50 mtr death.
Capacity of sump At Keshariya 8 ml , At Sonariya 2 ml.
Pump house detaile Size of pump house 1200 Sqm.
type RCC fram Structure
pumping capacity m3/Hrs 2145m3/Hrs 900m3/Hrs
Head 55 mtr. 55 mtr.
Number 4 Sets 2 Sets
Working 3 Sets. 1 Sets
Standby 1 Sets. 1 Sets
Working Hrs. 22 Hrs 22 Hrs

Projects

Previous Next

PROJECT  : NC 35

Section Name :  Botad to Gadhada
Package :  PACKAGE-D
Diameter & Thickness (In MM) :  1500
Length :  27.00                  Cost In Cr. :  83.32
Operated By :  GWIL
 

PROJECT  : NC 36

Section Name :  Chavand to Chamaradi to Derardi to Amarnagar
Package :  PACKAGE-D
Diameter & Thickness (In MM) :  1300/1200/1150
Length :  68.86                  Cost In Cr. :  146.05
Operated By :  GWIL
 

PROJECT  : NC 37

Section Name :  Amarnagar to Khirasara to Pithadiya to Dhoraji to Upleta and from Amarnagar to Vadiya
Package :  PACKAGE-D
Diameter & Thickness (In MM) :  1100/1025/800/700
Length :  75.82                  Cost In Cr. :  125.08