Completed Project : NC 28

Section Name :  Navda to Budhel
Package :  Swarnim Gujarat Project
Diameter & Thickness (In MM) :  2000 mm dia (FID) 14.0 mm M.S. pipeline
Transmission :  Pumping
Length :  77.30
Cost In Cr. :  433.42
Operated By :  GWIL
Executed By :  GWIL

Navda to Budhel

Salient Features of Project
Name of Project NAVDA-BUDHEL BULK WATER TRANSMISSION PIPELINE PROJECT
Section Navda - Budhel
Package NC-28
Start Date 5/11/2011
Completion Date 16/06/2013
Pipeline Details Dia of pipe in mm 2000 mm (FID) 14 mm thick ,inside epoxy lining & outside 3 LPE Coating
Length of pipe in km 77.300 km
Transmission Navda - Budhel
pipe carrying capacity In MLD 332.42
Details of sump No. of sump 2
Size of sump 40 X 40 Mt
Capacity of sump 10 ML @ Navda & 8 ML @ Budhel
Pump house detaile Size of pump house 130 Mt x 20 Mt
type HSCF
m3/Hrs 2310
Head 81 mt
Number 8
Working 6
Standby 2
pumping capacity 24 Hrs 332.64 MLD
22 Hrs 304.92 MLD
demand/supply 432.32

Projects

Previous Next

PROJECT  : NC-38

Section Name :  Upleta to Kutiyana- Ranavav
Package :  NC-38
Diameter & Thickness (In MM) :  800/600
Length :  63.98                  Cost In Cr. :  120.83
Operated By :  GWIL
 

PROJECT  : 300 MLD WSS for Brahmani dam-2 to NC7 PS ( PKG-1)

Section Name :  Brahmani Dam-II to NC-7 Morbi pumping Station
Package :  brahmani Project
Diameter & Thickness (In MM) :  2000
Length :  850.00                  Cost In Cr. :  29.17
Operated By :  GWIL
 

PROJECT  : 300 MLD WSS for Brahmani dam-2 to NC7 PS ( PKG-2)

Section Name :  Brahmani Dam-2 to Chakampar village
Package :  Brahmi Project pkg-2
Diameter & Thickness (In MM) :  2000
Length :  18400.00                  Cost In Cr. :  122.78
Operated By :  GWIL
 

PROJECT  : 300 MLD WSS for Brahmani dam-2 to NC7 PS ( PKG-3)

Section Name :  Chakampar village canal crossing road to Nava sadulka
Package :  brahmani Project pkg-3
Diameter & Thickness (In MM) :  2000
Length :  14600.00                  Cost In Cr. :  100.88
Operated By :  GWIL
 