Completed Project : NC 8

Section Name :  Tankara (Hirapar) to Jamnagar
Package :  Package C
Diameter & Thickness (In MM) :  1700 / 1900 / 2000 mm dia
Transmission :  Gravity
Length :  64.90
Cost In Cr. :  105.00
Operated By :  GWIL
Executed By :  GWIL

Tankara (Hirapar) to Jamnagar

Salient Features of Project

Name of Project NC-8
Section Hirapar to Jamnagar
Package NC-8
Start Date 12/11/2001
Completion Date 12/8/2002
Pipeline Details Dia of pipe in mm 2000/1900/1700
Length of pipe in km 64.9
Transmission M.S. Pipe line 10 mm thk
pipe carrying capacity In MLD 326
Details of sump No. of sump 3
Size of sump 50 x 50 m
Capacity of sump 10
Pump house detaile Size of pump house N.A.
type N.A.
m3/Hrs N.A.
Head N.A.
Number N.A.
Working N.A.
Standby N.A.
pumping capacity 24 Hrs N.A.
22 Hrs N.A.

Projects

Previous Next

PROJECT  : NC-38

Section Name :  Upleta to Kutiyana- Ranavav
Package :  NC-38
Diameter & Thickness (In MM) :  800/600
Length :  63.98                  Cost In Cr. :  120.83
Operated By :  GWIL
 

PROJECT  : 300 MLD WSS for Brahmani dam-2 to NC7 PS ( PKG-1)

Section Name :  Brahmani Dam-II to NC-7 Morbi pumping Station
Package :  brahmani Project
Diameter & Thickness (In MM) :  2000
Length :  850.00                  Cost In Cr. :  29.17
Operated By :  GWIL
 

PROJECT  : 300 MLD WSS for Brahmani dam-2 to NC7 PS ( PKG-2)

Section Name :  Brahmani Dam-2 to Chakampar village
Package :  Brahmi Project pkg-2
Diameter & Thickness (In MM) :  2000
Length :  18400.00                  Cost In Cr. :  122.78
Operated By :  GWIL
 

PROJECT  : 300 MLD WSS for Brahmani dam-2 to NC7 PS ( PKG-3)

Section Name :  Chakampar village canal crossing road to Nava sadulka
Package :  brahmani Project pkg-3
Diameter & Thickness (In MM) :  2000
Length :  14600.00                  Cost In Cr. :  100.88
Operated By :  GWIL
 