Inner slide

Completed Project : NC 8

Section Name :  Tankara (Hirapar) to Jamnagar
Package :  Package C
Diameter & Thickness (In MM) :  1700 / 1900 / 2000 mm dia
Transmission :  Gravity
Length :  64.90
Cost In Cr. :  105.00
Operated By :  GWIL
Executed By :  GWIL

Tankara (Hirapar) to Jamnagar

Salient Features of Project

Name of Project NC-8
Section Hirapar to Jamnagar
Package NC-8
Start Date 12/11/2001
Completion Date 12/8/2002
Pipeline Details Dia of pipe in mm 2000/1900/1700
Length of pipe in km 64.9
Transmission M.S. Pipe line 10 mm thk
pipe carrying capacity In MLD 326
Details of sump No. of sump 3
Size of sump 50 x 50 m
Capacity of sump 10
Pump house detaile Size of pump house N.A.
type N.A.
m3/Hrs N.A.
Head N.A.
Number N.A.
Working N.A.
Standby N.A.
pumping capacity 24 Hrs N.A.
22 Hrs N.A.

Projects

Previous Next

PROJECT  : NC 35

Section Name :  Botad to Gadhada
Package :  PACKAGE-D
Diameter & Thickness (In MM) :  1500
Length :  27.00                  Cost In Cr. :  83.32
Operated By :  GWIL
 

PROJECT  : NC 36

Section Name :  Chavand to Chamaradi to Derardi to Amarnagar
Package :  PACKAGE-D
Diameter & Thickness (In MM) :  1300/1200/1150
Length :  68.86                  Cost In Cr. :  146.05
Operated By :  GWIL
 

PROJECT  : NC 37

Section Name :  Amarnagar to Khirasara to Pithadiya to Dhoraji to Upleta and from Amarnagar to Vadiya
Package :  PACKAGE-D
Diameter & Thickness (In MM) :  1100/1025/800/700
Length :  75.82                  Cost In Cr. :  125.08
Operated By :  GWIL
 