Completed Project : SPP 3

Section Name :  Navda to Botad
Package :  Saurashtra Pipeline Project
Diameter & Thickness (In MM) :  1650 mm dia
Transmission :  Pumping
Length :  30.90
Cost In Cr. :  57.00
Operated By :  GWIL
Executed By :  GWSSB

Navda to Botad

Salient Features of Project

Name of Project SPP 3
Section Navda-Botad
Start Date Mar-99
Completion Date Jan-01
Pipeline Details Dia of pipe in mm 1650
Length of pipe in km 30.9
Transmission
pipe carrying capacity In MLD 105
Details of sump No. of sump 1 1
Size of sump 15x67x4.2 27x67x4.2
Capacity of sump 11.3 ML
Pump house detaile Size of pump house
type HSCF
m3/Hrs 1200
Head 99
Number 6
Working 4
Standby 2
pumping capacity 24 Hrs 115
22 Hrs 105


Projects

Previous Next

PROJECT  : NC 35

Section Name :  Botad to Gadhada
Package :  PACKAGE-D
Diameter & Thickness (In MM) :  1500
Length :  27.00                  Cost In Cr. :  83.32
Operated By :  GWIL
 

PROJECT  : NC 36

Section Name :  Chavand to Chamaradi to Derardi to Amarnagar
Package :  PACKAGE-D
Diameter & Thickness (In MM) :  1300/1200/1150
Length :  68.86                  Cost In Cr. :  146.05
Operated By :  GWIL
 

PROJECT  : NC 37

Section Name :  Amarnagar to Khirasara to Pithadiya to Dhoraji to Upleta and from Amarnagar to Vadiya
Package :  PACKAGE-D
Diameter & Thickness (In MM) :  1100/1025/800/700
Length :  75.82                  Cost In Cr. :  125.08
Operated By :  GWIL
 